• Stability
  • Engineering
  • Geel

Wijdbosch Geel

Wijdbosch Geel
about the case
  • Execution period. 2014-present
  • Client. SHM Geelse Huisvesting
  • Project type. Construction of 39 new residential units (apartments and houses)
  • Architect. 2DVW Architecten
  • Studies delivered.
    • Stability
    • Technical Engineering
  • Location. Geel
I have an interesting project
An interesting project?
Get in touch!