- Lier
Sports Hall De Kroon Lier
about the case
- Execution period. 2018 - 2019
- Client. Stadsbestuur Lier
- Project type. Extension of the existing sports hall
- Architect. Architectengroep A4 en Van Besien Van Noten Architecten
- Studies delivered.
- Stability
- Engineering
- EPB
- Location. Lier